FEATURE PROJECT

ROY HILL
 

December 2016

WEAR SYSTEM SOLUTIONS has been engaged by Roy Hill operations to 3D scan, model, draw, manufacture and supply the Train Load Out lower rotable chute section.

 

The chute design included the supply and installation of the WSS-PC0063 ceramic wear liners. WSS also supplied the jacking frames and transport cradles as required. 

All processes from design to fabrication and installation were completed on target after 18 days from the date of order to the installation on site.